2020 Tile Calculator

Maybe 1-2 inches before the tile stops so that the tile covers that seam. Redoing a bathe tub wall and came upon they used cement board for the bottom half of the wall, then some type of really crumbly, brown board on the highest half (I suppose it was inexperienced board?).

It will in all probability be a couple of days no less than before I’m carried out ending the seams and transfer on to RedGard software. I was considering doing the same with cement board however I understand that silicone and development adhesives don’t like to stick to it. Can I comb a thin layer of modified thinset onto studs/blocking before the CBU goes on to offer it more holding energy and fill any unevenness within the mounting surface?

Preventing water from leaking onto the framing lumber and subflooring behind a shower is at the coronary heart of of …